Some lessons learned on software development in 2018:

  • Take control of the data: when moving things around, like migrating data, I must think on the worst case scenario for that movement: loss? damage? Could you go back and restore everything? The initial movement must be a way to trace your steps back in time and restore the maximum amount of data modified (ideally everything) in the minor amount of time.

  • If something goes wrong, just rollback: on production deployments, downtime is the most important metric to observe. When things doesn’t go as expected there is no time to guess what’s going on; just put back the previous known working version. You can found and fix the bug later, with patience and no hurries.

  • One thing at time: I must take changes to production on logical steps and deploy them one at time, checking on every one that things go well. If I do multiple changes over a system and something goes wrong it could be very difficult (if not impossible) to determine the root cause, requiring me to rollback the N changes running in parallel, possibly increasing the downtime by the extra effort to put things back.

  • Visualize the end, know it, split it: to effectively reach a goal, I need to know what success looks like: new designs, metrics, textual descriptions on what is required, whatever is needed to describe it. As a whole, this artifacts must provide me a clear destination, then I need to understand it, visualize in my mind the required tasks to be done and possible problems to be found. I should split those tasks in chunks of similar amount of effort.

    This is the most concise description of a discipline I wrote. :)

  • Check my guts: if I see some behavior telling me that something is going wrong, then I should find proof that I’m wrong (unless the risk to go forth doesn’t worth it). It is not clever to go further if I don’t have information about the current status.